Key Features:
- Installed new HVAC system with gas rooftop units and VAV (variable air volume) control zones.
- Designed hot water plant and distribution system to serve reheat coils and fin radiation.
- Added supplemental heating for high-loss areas with perimeter fin tube radiation and vestibule cabinet heaters.
Outcome:
Created a comfortable, energy-efficient office space within a converted manufacturing building, supporting GE’s new battery production operations.